COLUMNS RESTORATION

6000 Fielding - Phase 2 - Header

The architecture of the 6000 Fielding Avenue in Montreal is outstanding. The development of building materials within this building demonstrates the commitment to enhance a lasting quality at the time. First occupied by the "Protestant School Board of Greater Montreal," this piece of art of the Borough of Côte-des-Neiges – Notre- Dame-de -Grâce was built in 1961. It was in 1998 that the building became the administrative center of the English-Montreal School Board.

Work done

  • Installation of a specialized type of construction scaffolding
  • Dismantling, numbering and reinstalling 56 architectural stones, each weighing 1800 lbs
  • Repair and reconstruction of 14 architectural stones with bronze rod, epoxy and mortar specially designed for the restoration
  • Reconstruction of calcareous hewn stones
  • Dismantling, moving and reconstruction of a dozen granite slabs weighing more than 1000 lbs
  • Injection by gravity of a natural hydraulic lime grout (St- Astier) to fill the air spaces between the stones and the steel column
  • Pointing stones on the other columns
  • Cleaning with specialized soap for limestone
  • Caulking for granite slabs

Photos